  • Sanitation and Wastewater Expert, having 15-year experience in the Sector. Currently working with CDDIndia as Project Manager. Got more than 15 years of experience in designing, implementing engineering solutions for management of wastewater, faecal sludge management, waterbody rejuvenation and drain remediation across India and South Asia.
  • Posts: 13
  • Likes received: 8

Webinar: Faecal Sludge Treatment Plants: Recent innovations in the designs; 2nd July 3-430 pm IST

Background: This year – 2024 – marks a decade of Swachh Bharat Mission (SBM),the Government of India’s flagship programme to improve sanitation. While Phase I focused on the elimination of open defecation through construction of house-hold and community toilets, SBM 2.0, launched in 2021, seeks a more complete approach to liquid waste management.  It stresses that “all faecal sludge and waste(used) water aresafely contained, transported, processed and disposed of, so that no untreatedfaecal sludge or used water pollutes the ground or water bodies”.

In the intervening period, the government had also come out with the National Faecal Sludge and Septage Management(FSSM) policy (available here ) in 2017. This policy acknowledged the large-scale dependence on onsite sanitation systems (OSS) such as septic tanks and soak pits, as well as lack of treatment options available for faecal sludge (FS) generated in such systems.  As a result, various models for streamlining components of FSM – collection, transport and treatment – have been demonstrated in the last decade.

Faecal Sludge Treatment Plants (FSTPs) have emerged as a solution for safe disposal and treatment of faecal sludge and septage which otherwise ends up in open drains and water bodies. As per the SBM-G dashboard , there are over 2,600 such plants in various stages of design and implementation in the country. While there have some successful demonstrations of FSTPs, they still face a lot of challenges. A primary challenge is the over- or under-loading of plants, which could be a result of design or other O&M issues either at the plant or from lack of integration with other components of FSM. Other issues include shortage of land, insufficient infrastructure, lack of desludging trucks, trained personnel, and safety equipment, failure in operation and maintenance activities of the treatment plant, all of which compound the problem.

The design and other technical challenges faced by FSTPs necessitates a discussion on innovations and improvements that have happened recently as well as those further required. With this objective, a webinar on “2nd July 2024” at 3PM- 4.30 PM is being jointly organised by Consortium for DEWATS Dissemination Society (CDD India), Centre for Science and Environment (CSE) and Ecosan Services Foundation (ESF).

Register Here:  forms.gle/VX2gVrF6hFqzG6uE7  
     
Best Regards
Rohini Pradeep
This email address is being protected from spambots. You need JavaScript enabled to view it.

CDD Society
Survey No. 205 | (Opp. Beedi Workers Colony) | Kommaghatta Road, Bandemath |Kengeri Sattelite Town | Bengaluru 560060

This message has an attachment file.
Please log in or register to see it.

Please Log in to join the conversation.

You need to login to reply
Page selection:
Share this thread:
Recently active users. Who else has been active?
Time to create page: 0.088 seconds
Powered by Kunena Forum